Home › Articles › News › Youths block Narok-Mai Mahiu Highway over SGR jobs

Youths block Narok-Mai Mahiu Highway over SGR jobs

the Narok-Mai Mahiu Highway during a protest by local youths
The Narok-Mai Mahiu Highway during a protest by local youths | SGA
Branches lie across the tarmac as locals press the Chinese contractor on Section 2B for work.

Protesting local youths have blocked the Narok–Mai Mahiu Highway, disrupting traffic on the key corridor. They are demanding employment from the Chinese contractor undertaking Section 2B of the Narok Standard Gauge Railway (SGR) project.

Photographs from the scene show cut branches and shrubs dragged onto the carriageway. Vehicles, including pickup trucks, vans and a lorry, have come to a halt on both sides of the obstruction. Groups of young men stand on the tarmac and the dusty verge.

The highway links the Nairobi approach through Mai Mahiu to Narok town and onward towards the Maasai Mara and south-western Kenya. It carries tourist traffic, intercounty buses and freight. Any prolonged stoppage leaves motorists with few immediate options on that stretch.

A security and traffic advisory has been issued for users of the route. Drivers are being told to expect delays, exercise caution around the protest area and avoid confrontation. Alternative routes should be considered where possible. The situation is being monitored for any further blockage or escalation.

Section 2B forms part of the Naivasha–Kisumu SGR extension launched in Narok County in March 2026. Construction of the line in the county is planned over about 98 kilometres through Narok East, Narok North, Narok West and Narok South. China Communications Construction Company is the contractor on the wider Phase 2B works.

Local employment has been a recurring demand along this corridor during earlier phases of the railway. In previous years, youths in the Suswa and Duka Moja area pressed contractors for casual and unskilled work as camps and earthworks opened. Those earlier disputes are a matter of public record. They are not, on the available information, formally tied to Saturday’s action.

The same highway has been closed on other occasions this year, including after flash floods cut a bridge at Eor Ekule and after livestock accidents. On 23 August, leaders from Narok, Nakuru and Kajiado counties, meeting with Rift Valley Regional Commissioner George Natembeya, said they had agreed the Maai Mahiu–Narok–Mulot road should not be closed again. They said a committee of elders and security officers would handle disputes instead.

Saturday’s blockade sits beside that pledge rather than as a stated consequence of it. No official statement from Kenya Railways, the contractor or county security had been issued at the time the first reports circulated. No figure for the number of protesters, duration of the stoppage or arrests has been confirmed.

Motorists already on the road have been left waiting beside the piled vegetation. A blue roadside kiosk and an iron gate appear in images from the site, suggesting the blockage is near a homestead or small trading point rather than in Narok town itself. Exact kilometre posts have not been given.

For travellers heading to Narok or the Mara, common alternatives in past disruptions have included the Ngong–Suswa road and the longer Nairobi–Naivasha–Nakuru–Mau Narok route. Those options add distance and time. They are not official diversions issued for this incident.

Construction sites on large rail projects typically recruit a mix of skilled staff brought in by the contractor and casual labour drawn from nearby settlements. How many positions Section 2B will open in Narok, and on what terms, has not been detailed in the reports of the protest. The youths’ demand is simply for employment opportunities.

Until the branches are cleared and traffic is waved through, the corridor remains interrupted. Drivers are advised to check local updates before committing to the Mai Mahiu–Narok alignment and to treat the protest area as an active obstruction rather than an ordinary delay.

Comments (1)

Leave a Comment

0/1000 characters
Share Barabara
Share Barabara âś“
26 minutes ago
Updates to follow
Net: 0