Budget
Calculator

Estimate your construction project costs based on finish type and floor area — calibrated for the Kenyan market.

Disclaimer: Amounts vary significantly depending on location and the quality of desired finishes. Consult a professional or contact us directly.

Project Budget Estimator

Calibrated for the Kenyan market

1 Enter your floor area
Total built-up area of all floors combined
2 Select a finish level

Cost Estimate

Fill in the form to see your results

Your estimate will appear here

Enter your floor area and select a finish type, then click Calculate My Budget.

Crunching the numbers…

Estimated Total Cost
Floor Area
Rate / m²
+10% Buffer
Cost Breakdown (approx.)
Want an accurate quote? Our team gives free professional estimates.
Contact Us

What Each Option Includes

Choose the finish level that matches your project goals and budget.

Budget Finishes

Basic finishes for rental properties or cost-conscious builds. Standard tiles, basic fixtures, and simple wall finishes.

KES 30,000 / m²

Standard Finishes

Good quality for family homes. Ceramic tiles, standard fixtures, painted walls, and decent kitchen and bathroom fittings.

KES 35,000 / m²

High-End Low

Premium finishes with quality materials. Porcelain tiles, branded fixtures, quality kitchen cabinets, and good bathroom fittings.

KES 40,000 / m²

High-End Finishes

Luxury finishes with top-quality materials. Marble or granite, premium fixtures, custom cabinetry, and high-end appliances.

KES 50,000 / m²

Before You Build

Location Variations

Costs can vary 20–40% by location. Urban areas like Nairobi typically cost more than rural areas.

Market Fluctuations

Material costs change with market conditions. Estimates reflect current average Kenyan market prices.

Additional Costs

Budget for contingencies (10–15%), professional fees, permits, and site preparation.

Labour Costs

Labour is included in these estimates but may vary based on local availability and skill level required.