An Indian content creator @parmarcore has drawn widespread attention after completing an Uber Boda trip from Nairobi to Mombasa, an unusually long journey that stretched across much of Kenya's busiest transport corridor.
The rider, Job Njoroge, accepted the booking through the Uber app before the pair left Nairobi at around 9am. They arrived in Mombasa at about 10pm after spending roughly 13 hours on the road.
Screenshots shared during the journey showed the fare from Nairobi to Mariakani had reached KSh7,770. The app estimated a distance of about 438.5 kilometres to that point, illustrating just how far the motorcycle had travelled before the final leg into Mombasa.
The trip continued beyond Mariakani, with the pair eventually reaching Mombasa safely. Videos recorded along the route showed them passing through different parts of the country before confirming their arrival at the Coast.
Online discussions quickly picked up the story, with many people expressing disbelief that an Uber Boda request could cover such a distance. Others joked that both the passenger and rider deserved equal credit for agreeing to complete the journey.
Some conversations focused on the practical side of the trip. Travelling more than 450 kilometres on a motorcycle raises questions about fuel costs, rider fatigue, regular rest breaks and the physical demands of spending an entire day in the saddle.
Images circulating online also displayed a final fare of KSh17,200 for the Nairobi to Mombasa journey. Uber has not publicly commented on the ride or confirmed additional details.
Uber Boda was introduced in Nairobi in 2018 as a motorcycle ride-hailing service aimed primarily at short urban trips. It is widely used for first and last-mile travel, allowing passengers to avoid traffic congestion on busy city roads.
The Nairobi to Mombasa trip falls well outside the service's typical use. Even so, the journey ended safely, turning what began as a routine ride request into one of the country's most unusual ride-hailing stories and prompting fresh discussion about the limits of app-based transport.
Crazy stuff.
#ShareBarabara
Comments (0)
Leave a Comment
No comments yet. Be the first to share your thoughts!