Joshua Atlantean
Editor
Articles
Engineers grow living biological circuit boards inside Petri dishes using bacteria
Researchers engineered bacterial strains to act as transistors, printing living circuits capable of executing biological computing operations.
Kakamega tarmacking begins for Mumias-Matawa-Indangalasia road
Tarmacking on 10-kilometre road connecting Mumias West and Matungu begins to open rural trade routes.
Dangote Refinery Secures $400 Million Underwriting Commitment Ahead of Public Listing
Financing support from international advisers strengthens balance sheet projections prior to launching the public share offering.
EACC presents report on examination of systems in cooperative sector
Anti-graft agency hands over its findings on structural governance gaps to ministry officials following a comprehensive sector review.
How Kenyan surveyors accumulate 50 annual CPD points under updated guidelines
Surveyors must secure 50 annual points to maintain practice licensing, with new rules detailing approved activities and caps.
Treasury signals income tax relief with Sh78bn cuts
Kenya expects a larger budget gap as fiscal policy shifts toward potential tax reductions.
SpaceX guides floating Starship rocket to Christmas Island
Engineering crews have positioned the floating spacecraft near shore to conduct detailed assessments before attempting transit back to port facilities.
Spacex sets speed record with dual Falcon 9 launches from opposite coasts
SpaceX sets a company record by launching two Falcon 9 rockets from opposite coasts of the United States just 38 minutes apart.
Kenyan engineers tackle financing and green growth at annual conference
Engineers gathered to address key infrastructure financing, green technology, and professional leadership challenges facing Kenya's construction sector.
Six nations move up in World Bank 2026 income map
Six economies upgraded their standing in the new World Bank country income classifications, while no nations dropped down.