President William Ruto has formally signed a lease agreement between the Zaria Group and the Kenya Railways Corporation. This deal facilitates the construction of a modern arena and an entertainment district in central Nairobi.
The signing ceremony took place at the State House, Nairobi, on April 10, 2026. This move represents a primary step in the advancement of the broader Nairobi Railway City Project.
The Nairobi Railway City is a multi-billion-shilling flagship project. It intends to de-congest the city center while creating a world-class urban hub. The addition of an entertainment district aims to integrate commercial leisure with transport infrastructure.
President Ruto noted that the partnership with the private sector is vital for large-scale infrastructure. The lease enables Zaria Group to begin site preparations for the arena. This facility is expected to host international events, sports, and cultural festivals once completed.
Kenya Railways Corporation will oversee the integration of this district with existing rail services. The project site sits on prime land that has historically served as the city's primary transit point.
The Nairobi Railway City master plan includes residential units, offices, and green spaces. By introducing a modern arena, the government hopes to attract regional tourism and boost the local hospitality sector.
Architectural plans for the entertainment district suggest a focus on high-density, mixed-use structures. These designs must align with the environmental standards set for the entire railway city precinct.
Officials from the Ministry of Lands and Public Works attended the signing. They emphasized that the lease follows strict procurement and land-use guidelines. This ensures the project remains a public-private partnership that benefits the city's long-term growth.
The Nairobi Railway City project was originally launched to modernize the 425-acre colonial-era railway station area. It is one of the largest urban regeneration efforts in East Africa.
Zaria Group is expected to release further details on the construction timeline and the specific capacity of the arena in the coming months. For now, the lease signing provides the legal framework for the developers to move on-site.
This development follows several years of planning and negotiations regarding land tenure within the railway corridor. With the lease now active, the transition from planning to active construction is imminent.